1.
The Role of Construction Army in Recovery Phase Disaster Landslide (Study Case of Yonzikon 13/KE Task at Sukamakmur Bogor). IJSSRR. 2023;6(2):547-553. doi:10.47814/ijssrr.v6i2.1027